Bentall Tower 1 Chiller Replacement & Energy Study
Bentall Tower 1 Chiller Replacement & Energy Study
The chilled water plant at Bentall Centre is nearing the end of life and requires replacement. When developing the strategy for replacement the Flow Team leveraged available incentives through
910 Mainland
The enterprise software company that hired Flow currently leases 2-1/2 floors at 910 Mainland, a building that takes up the entire block between Mainland, Cambie, Smithe and Nelson. The lower